Thermoforming and vacuum forming in Chennai, India. Established 1995.

  1. Home
  2. Capabilities
  3. Quality

Quality and compliance

A proved tool, a signed first article and experienced operators keep every batch the same.

Process control

Six checkpoints from sheet to shipment

Incoming sheet

Every lot checked for gauge, colour and finish.

Tool proving

Draw, corners and trim proved on the production machine.

First article

You sign off the sample. It becomes the batch reference.

In-process checks

Pockets, depth and flange checked through every run.

Final inspection

Scuffs, thin corners and burrs checked, then counted.

Dispatch record

Quantity, material and date logged for traceability.

Documentation

What comes with an order

  • Signed first-article sample
  • Material grade and supplier documents
  • Dimensional check against your drawing
  • Packing list and vendor registration papers

Tolerances

Agreed before the tool is cut

Forming is not injection moulding, so we agree what each feature can hold up front and prove it on the first article.

  • Critical dimensions agreed in writing
  • Trim tooling built around the key feature
  • Stacking checked on real cartons

Sustainability

Less plastic per part

  • Right gauge, not over-specified sheet
  • Trim kept by polymer for recycling
  • Returnable trays in place of single-use packs

Review an existing pack

Send a current tray. We will tell you if the gauge or layout can save material.

Request a pack review

Next step

Auditing a new packaging vendor?

We will send plant details and documents, and arrange a visit to Thirumudivakkam.